Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the om_shortcodes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
SR 528/Beachline Expressway at I-95 Safety Improvements, Brevard County, FDOT District 5 - Faller Davis & Associates, Inc.

SR 528/Beachline Expressway at I-95 Safety Improvements, Brevard County, FDOT District 5

Our safety study and design reduced lane departure crashes on the interchange ramps. The study included crash, operational, and safe curve speed analyses. The design included granite aggregate friction course, advisory speed modifications, warning signs and pavement marking improvements.

Back to Top