Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the om_shortcodes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
District Wide Ped/Safe Greenway Deployment - ITS Communication, FDOT District 5 - Faller Davis & Associates, Inc.

District Wide Ped/Safe Greenway Deployment – ITS Communication, FDOT District 5

The first portion of the project involved the implementation of a pedestrian and bicycle collision avoidance system that utilizes connected vehicle technologies to reduce the occurrence of pedestrian and bicycle crashes. The second portion involved increasing throughput capacity and reducing congestion by optimizing traffic signal operations with the implementation of technologies. FDA prepared the design plans for the parking lot availability system and transit kiosks on the UCF campus.

Back to Top