Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the om_shortcodes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Active Arterial Management Phase I, Orlando Urban Area, FDOT District 5 - Faller Davis & Associates, Inc.

Active Arterial Management Phase I, Orlando Urban Area, FDOT District 5

Our design to install over 50 Bluetooth devices mitigates traffic congestion levels by providing real time travel time data which allows each corridor to be actively monitored and managed. Access to the signal cabinets was gained through coordination with maintaining agencies and the locations were field reviewed to identify suitable areas to install the devices where free flowing traffic was present. Each signal cabinet was inventoried and plans were developed to connect the devices to the nearest signal cabinet with a fiber optic connection. If a fiber optic connection was not present, a GSM wireless network Bluetooth device was installed. We developed fiber optic splice and network layout diagrams to route the data to the FDOT network hubs. The project was completed in four months.

Back to Top