Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the om_shortcodes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
I-4/Selmon Expressway Connector, Hillsborough County, FDOT District 7 - Faller Davis & Associates, Inc.

I-4/Selmon Expressway Connector, Hillsborough County, FDOT District 7

The design of the interchange removed Port of Tampa truck traffic from Ybor City with direct access to the Interstate. This project provided a connection between the Port of Tampa, the SR 618 Selmon Connector, and I-4. FDA provided the signing and pavement marking plans that included the design of three miles of the mainline, over eight miles of the ramps, and 51 sign panels on 25 sign structures, with the largest sign being over 800 square feet.

Back to Top